Are there differences in the polymerisation times between the standard and opaque shades?

Polymerisation times

Yes, the opaque shades and some darker standard shades (A4, B3, C3, D3, HKA5) must be polymerised for 40 seconds. These shades absorb a lot of light and require longer lighting for complete curing. 20 seconds is sufficient for curing all other standard Vita shades.